COVID-19 SERVICES UPDATE: Information for all alert levels, Waka Kotahi services and more

SCAM ALERTS: Refund email and Vehicle licence (rego) renewal phishing emails

ONLINE SERVICES: We currently have an issue with receiving some payments and are working to resolve this issue as quickly as possible. We apologise for any inconvenience.

EASTER WEEKEND – PLAN AHEAD: Heading away for the long weekend? Check our holiday journeys tool(external link)

Delays on SH3 next weekend for rock removal at Awakino Tunnel

|

Traffic on State Highway 3 near the Awakino Tunnel will be stopped for 20-30 minutes at around 11am and 3pm on Saturday 11 and Sunday 12 July to allow for controlled explosions to crack a large rock near the road, Waka Kotahi NZ Transport Agency advises.

After a successful trial blast on 14 June to measure vibrations and assess traffic, the procedure for the main blast has been divided into four smaller blasts to keep traffic delays to a minimum.

The rock is located by the Awakino Tunnel, within the Awakino Tunnel Bypass work site, and needs to be removed in a controlled manner as there is a risk it may fall on to the road in the future.

When the explosion is taking place, a 300 metre exclusion zone will be in place around the rock, so motorists may find themselves stopped some way from the tunnel.

Other short delays to SH3 traffic are possible while the team prepares for the explosion and cleans up afterwards.

Motorists travelling on SH3 between Taranaki and Waikato should allow extra time for their journeys and be prepared for long queues around the time of the explosions.

If the controlled explosions can’t go ahead as planned next weekend, an alternative date or procedure will be advised.

Waka Kotahi thanks motorists for their patience.

Plan ahead for a safe, enjoyable journey this summer. Keep up to date with:

Tags