Skip to content

Important notice

The building where our contact centre is based was evacuated on 13 June. Our contact centre and emails are up and running again, but please be patient as we have limited support available. If you’re waiting for an application, please have a look at our current processing times.

Access keys for nzta.govt.nz

  • h Home
  • m Menu
  • 0 Show list of access keys
  • 2 Skip to content
  • 3 Skip to top

Eastbound lanes on Wiri Station Road Bridge now open

|

The NZ Transport Agency advises that the eastbound lanes of the Wiri Station Road Bridge are now open as part of the SH20-1 Manukau Extension project.

The NZ Transport Agency advises that the eastbound lanes of the Wiri Station Road Bridge are now open as part of the SH20-1 Manukau Extension project.

New chipseal has been laid on the lanes and motorists are asked to slow down and observe a 30 km/h speed limit in place.

The opening of the bridge is the culmination of a significant construction period on the project. Motorists are now using a new on-ramp at Redoubt Road to go south and a new link across Lambie Drive Bridge.

The NZ Transport Agency thanks you for your co-operation during this work.

For more information please contact:

SH20-1 Manukau Extension project office
T          0800 SH20 2 1 (0800 742 021)
W         www.nzta.govt.nz/manukauextension/(external link)

Top