SH11 Airfield to Lily Pond

Section menu

Project introduction

This project saw wire rope side barriers installed on State Highway 11 from Haruru Airfield to the Lily Pond Bridge in areas where there was a high risk of crashes caused by drivers running off the road.

  • Estimated project cost

    $2.7 million
  • Project type

    Safety improvements
  • Project status

    Completed

Purpose

To reduce the occurrence of crashes caused by drivers running off the road on SH11 between Haruru Airfield to the Lily Pond Bridge by installing wire rope side barriers.

Benefits

Increased safety on the route, resulting in fewer deaths and serious injuries.