Project introduction

A project to improve safety and efficiency for road users on the stretch of State Highway 16 between Brigham Creek and Waimauku in Auckland.

  • Estimated project cost

    $70 million
  • Project type

    Safety improvements
  • Project status

    Design

Subscribe to updates

What does subscribing mean? Please read our Privacy statement

 

About the project

Between 2010 and July 2019 three people were killed, and 29 people were seriously injured whilst travelling along State Highway 16 within the project area. Over a third of these crashes were caused by drivers losing control and running off the road or crossing the centreline and hitting an oncoming vehicle. This makes it one of the highest-risk rural roads in the country. 

This road is an important link for the local community, as well as providing resilience within the wider Upper North Island state highway network. Over 36,000 vehicles a day use the route between Brigham Creek and Kumeu, and over 15,000 vehicles are travelling between Huapai and Waimauku each day. Residential and business growth has increased and will continue to do so as the North West develops. This increases vehicle numbers and puts pressure on our network.

The community recognises the need for safety and capacity improvements along this route. We are investigating what needs to be done before more people lose their lives. 

To make SH16 safer, we’re looking at making a number of improvements:

  • Putting in flexible road safety barriers to catch drivers who leave their lane before hitting something harder like trees, poles, ditches or other vehicles. Flexible barriers will be installed along the road except between Taupaki and Kumeu.
  • Adding extra lanes between Brigham Creek and Taupaki roundabout from two lanes to four (two in each direction) to help improve travel times in the short-term, ahead of a longer-term improvements.
  • Putting in a flush median, which is a painted area in the middle of the road to give you more room and a safe place to wait before turning, while traffic can continue to flow.
  • SH16/Coatesville Riverhead Highway intersection improvements to help traffic flow better and make it safer to turn.
  • Between Brigham Creek and Kumeu we are creating a dedicated shared path for people who walk and cycle to provide genuine travel choice.
  • Between Huapai and Waimauku, we are widening bridges that are too narrow and making it safer to turn into Foster, Station and Factory Roads.
  • Between Huapai and Waimauku creating a wider road shoulder so there’s more space for people who cycle.

View the project map [PDF, 1.6 MB]

The focus of this project is to improve safety and congestion in the short term. Auckland Council, Auckland Transport and Waka Kotahi NZ Transport Agency are investigating plans for the longer-term to address future growth, including in Auckland’s North West.

Project staging

There are two stages of this project. Stage one runs from Huapai to Waimauku and stage two is between the Brigham Creek roundabout and Kumeu. We’ve started on the section between Huapai and Waimauku where there are slightly less complexities and where half of the crashes were head-on. Work will start on this section while we confirm aspects of the design for stage two.

Project timeframes

Design for this Stage one is now complete, and we have begun preparing for initial works. We are continuing to work with landowners to buy the land we need to construct the project.

Enabling works on Berry’s Bridge have now been completed. The works were required to relocate a gas main were initially delayed due to COVID 19.

We have gone out to market for a preferred tenderer and hope to award the contract from late-2020 with works starting from early-2021.

We recently received approval for additional funding to progress the design and construction of Stage two. Through consultation with the community, we have identified a significant number of additional project requirements and consequently we needed a substantial increase in funding to implement this stage. 

Our team is now progressing the preliminary design with initial site surveys from early-October to inform the planning.  

As part of our design works, we will be undertaking surveys within the road corridor and on private property.

Updated timeframes are shown below.

Stage one: Huapai to Waimauku*

*Timeline is indicative only and subject to change.

Stage two: Brigham Creek to Kumeu*

*Timeline is indicative only and subject to change.