Publications

Filter by type:

Show:

Interim scheme assessment report, volume 1

PDF (5.5 MB) Project reports
1 Mar 2001

Interim scheme assessment report, volume 2 – appendix J, part 2

PDF (4.7 MB) Project reports
1 Mar 2001

Interim scheme assessment report, volume 2 – appendix K to M

PDF (3 MB) Project reports
1 Mar 2001

Interim scheme assessment report, volume 2 – appendix J, part 1

PDF (5.1 MB) Project reports
1 Mar 2001

Interim scheme assessment report, volume 2 – appendix J, part 3

PDF (4.9 MB) Project reports
1 Mar 2001

Interim scheme assessment report, volume 2 – appendix N

PDF (5.2 MB) Project reports
1 Mar 2001

Basin Reserve at-grade intersection proposals

PDF (4.2 MB) Project reports
1 Jun 2008

Ngauranga to Airport Transport Strategy Lambton Quay Safety Assessment

PDF (3.4 MB) Project reports
1 Jul 2008

Basin Reserve grade separation project feasibility report

PDF (4.8 MB) Project reports
29 Sep 2008

Summary report on the Basin Reserve workshop, part 5

PDF (4.8 MB) Project reports
5 Jan 2009

Summary report on the Basin Reserve workshop, parts 1 to 4

PDF (2.9 MB) Project reports
5 Jan 2009

Summary report on the Basin Reserve workshop, addedum

PDF (784 KB) Project reports
5 Jan 2009

Feasible options report

PDF (2.8 MB) Project reports
30 Jan 2011

Feasible options report – appendices

PDF (3.8 MB) Project reports
30 Jan 2011

Total corridor transportation technical note

PDF (3.1 MB) Project reports
1 Jul 2011

Wellington inner city transport improvements, July/August 2011

PDF (2.5 MB) Public consultation
4 Jul 2011

Preliminary assessment of Option X

() Project reports
30 Sep 2011

Community engagement summary report

PDF (4.4 MB) Project reports
24 Apr 2012

Interim scheme assessment report, volume 2 – appendix O to P

PDF (5.3 MB) Project reports
1 Mar 2015