Published: July 2022 | Category: Project & contract management , Manuals | Audiences: Road traffic engineers & consultants, Roading contractors
SM031 is a manual for use by consultants when preparing state highway tender documents for traditional, design and construct, lump sum, alliancing and minor works and physical works construction contracts.
Related information
Number |
Title |
Last updated |
|
Aug 2021 |
|
A0 |
March 2022 |
|
|
March 2022 |
|
Appendix A - Traditional |
||
A1 |
Instructions for tendering [PDF, 725 KB] See Technical Advice Note: #21-21 Update for tendering to manage cost volatility(external link) which outlines changes made to this document in December 2021 |
March 2022 |
A6 |
March 2022 |
|
A7 |
March 2022 |
|
A8 |
July 2022 |
|
A9 |
Consultant's standard – technical specifications [PDF, 30 KB] |
Mar 2020 |
A10 |
Aug 2021 |
|
Appendix B - Design and construct |
||
|
Statement of interest and ability |
n/a |
B2 |
Instructions for tendering [PDF, 808 KB] See Technical Advice Note #21-21 Update for tendering to manage cost volatility(external link) which outlines changes made to this document in December 2021 |
March 2022 |
B3A |
March 2022 |
|
B3B |
Appendices to principal's requirements |
n/a |
B4 |
Conditions of contract [PDF, 802 KB] See Technical Advice Note #21-21 Update for tendering to manage cost volatility(external link) which outlines changes made to this document in December 2021 |
July 2022 |
B5 |
Basis of payment [PDF, 213 KB] |
March 2022 |
Appendix D - Alliance |
||
|
Appendix D (also known as Alliancing) is subject to intellectual copyright. Contact Waka Kotahi NZ Transport Agency (email procurement@nzta.govt.nz with the subject line 'Feedback for SM031') if you want to use this document. |
July 2021 |
Appendix E - Minor works |
||
E1 |
Minor works/closed contest [PDF, 781 KB] See Technical Advice Note #21-21 Update for tendering to manage cost volatility(external link) which outlines changes made to this document in December 2021 |
July 2022 |
E2 |
Minor works/direct appoint [PDF, 678 KB] See Technical Advice Note #21-21 Update for tendering to manage cost volatility(external link) which outlines changes made to this document in December 2021 |
July 2022 |
Appendix H - Early contractor involvement |
||
H1 |
Instructions for tendering [PDF, 492 KB] See Technical Advice Note #21-21 Update for tendering to manage cost volatility(external link) which outlines changes made to this document in December 2021 |
March 2022 |
H2 |
March 2022 |
|
H3 |
Conditions of contract [PDF, 719 KB] See Technical Advice Note #21-21 Update for tendering to manage cost volatility(external link) which outlines changes made to this document in December 2021 |
July 2022 |
H4 |
March 2022 |