Displaying 1 - 10 results of 516 for ""
Published: August 2007
Category:
Environment & resource planning
,
Manuals
| Audiences:
Land owners,
Road traffic engineers & consultants,
Roading contractors
The Planning policy manual (PPM) sets out NZ Transport Agency Waka Kotahi (NZTA) policy and approach to integrated planning.
Published: 2 October 2025
Category:
Technical advice note
| Audiences:
Road traffic engineers & consultants,
Roading contractors
This newsletter provides key updates and a summary of recent revisions to existing standards and addition of new standards on the NZ Transport Agency Waka Kotahi (NZTA) register of Standards and Guidelines, and identifies NZTA standards that are curr…
Published: October 2025
Category:
Signs
,
Maintenance
,
Specifications
| Audiences:
Road traffic engineers & consultants,
Roading contractors
This specification sets out performance requirements for traffic sign manufacturers wishing to design and manufacture, and contractors wishing to install and maintain permanent traffic signs in New Zealand.
Published: 2 July 2025
Category:
Project & contract management
,
Manuals
| Audiences:
Road traffic engineers & consultants,
Roading contractors
A manual for use by NZ Transport Agency Waka Kotahi when preparing tender documents for professional services contracts.
Published: 30 October 2024
Category:
Guidance for specialists
| Audiences:
Local & regional government,
Road controlling authorities,
Road traffic engineers & consultants,
Roading contractors
The Infrastructure risk rating manual (IRR) is a proactive method for assessing road safety risk developed by NZ Transport Agency Waka Kotahi.
Published: 30 June 2025
Category:
Technical advice note
| Audiences:
Road traffic engineers & consultants,
Roading contractors
This newsletter provides key updates and a summary of recent revisions to existing standards and addition of new standards on the NZ Transport Agency Waka Kotahi (NZTA) register of Standards and Guidelines, and identifies NZTA standards that are curr…
Published: June 2025
Category:
Construction
,
Pavement & surfacing
,
Specifications
| Audiences:
Road traffic engineers & consultants,
Roading contractors
The T29 laboratory test method provides an independent means for the random identification and selection of test sites within a construction or pavement Lot.
Published: 5 June 2025
Category:
Materials
,
Chipsealing
,
Specifications
| Audiences:
Road traffic engineers & consultants,
Roading contractors
NZTA T09 Procedure for the Procedure for the Estimation of the Kerosene Content of Cutback Bitumen sets out a procedure by which the kerosene content of cutback bitumen is estimated from the kinematic viscosity of a sample.
Published: June 2025
Category:
Construction
,
Surfacing
,
Specifications
| Audiences:
Road controlling authorities,
Road traffic engineers & consultants,
Roading contractors
The T30 laboratory test method is used to detect the presence of adhesion agent chemicals in cutback bitumen used as a binder for chip sealing.
Published: June 2025
Category:
Construction
,
Chipsealing
,
Specifications
| Audiences:
Road traffic engineers & consultants,
Roading contractors
P18 Specification for the design of chip seals sets out a client-prescribed method for the design of a range of chip seal techniques used in New Zealand.