Average speed cameras check how fast you are driving along a stretch of road. They calculate a vehicle’s speed between 2 cameras.
Average speed camera information [PDF, 80 MB]
We're operating our first pair of average speed safety cameras at Matakana Road in Warkworth, Auckland. We're preparing to operate average speed cameras at a further 16 locations, which are at various stages of construction.
In most cases there will be sometime between cameras being installed and us switching them on to enforce.
When we don’t expect to operate cameras for some time we’ll install ‘camera not in use’ signs. We may test the cameras but won’t be enforcing speeding when these signs are in place.
Before we begin operating any set of average speed cameras we’ll install ‘average speed camera area’ signs. The signs may go up before enforcement begins. These signs are there to remind drivers to check their speed and slow down if needed.
| Area | Location | Status | Expected enforcement date | Baseline speed survey* |
| Kaitaia | Kaitaia-Awaroa Road | Testing | Mid to late 2026 | 25% (May 2024) |
*Baseline speed survey column shows the % of vehicles travelling to the speed limit and the dates speeds were measured.
| Area | Location | Status | Expected enforcement date | Baseline speed survey* |
| Dairy Flat | Kahikatea Flat Road | Under construction | Early to mid 2026 | 73% (Sep 2022) |
| Dairy Flat | Pine Valley Road | Under construction | Early to mid 2026 | 26% (June 2024) |
| Glenbrook | Glenbrook Road West | Under construction | Mid 2026 | 76% (Sep 2022) |
| Karaka/Kingseat | Glenbrook Road East | Under construction | Early to mid 2026 | 87% (Sep 2022) |
| Redvale | East Coast Road | Under construction | Mid 2026 | 82% (Sep 2022) |
| Shamrock Park/Whitford | Whitford Road | Under construction | Early to mid 2026 | 45% (Sep 2022) |
| Warkworth | Matakana Road | Enforcing | Now enforcing | 88% (Sep 2022) |
*Baseline speed survey column shows the % of vehicles travelling to the speed limit and the dates speeds were measured.
| Area | Location | Status | Expected enforcement date | Baseline speed survey* |
| Matatā | State Highway 2 | Under construction | Early to mid 2026 | 55% (Jun 2024) |
| Tumunui | State Highway 5 | Under construction | Early to mid 2026 | 53% (Jun 2024) |
*Baseline speed survey column shows the % of vehicles travelling to the speed limit and the dates speeds were measured.
| Area | Location | Status | Expected enforcement date | Baseline speed survey* |
| Mangatāwhiri | State Highway 2 Pōkeno to Mangatāwhiri | Under construction | Early to mid 2026 | 72% (Nov 2023) |
*Baseline speed survey column shows the % of vehicles travelling to the speed limit and the dates speeds were measured.
| Area | Location | Status | Expected enforcement date | Baseline speed survey* |
| Te Hauke | State Highway 2 Te Hauke to Pakipaki | Planned | Mid to late 2026 | 84% (July 2025) |
*Baseline speed survey column shows the % of vehicles travelling to the speed limit and the dates speeds were measured.
| Area | Location | Status | Expected enforcement date | Baseline speed survey* |
| Sanson | State Highway 1 Sanson to Foxton | Planned | Mid to late 2026 | 85% (July 2025) |
*Baseline speed survey column shows the % of vehicles travelling to the speed limit and the dates speeds were measured.
| Area | Location | Status | Expected enforcement date | Baseline speed survey* |
| Upper Hutt | State Highway 2 Mārua to Brown Owl | Planned | Mid 2026 | 19% (June 2025) |
*Baseline speed survey column shows the % of vehicles travelling to the speed limit and the dates speeds were measured.
| Area | Location | Status | Expected enforcement date | Baseline speed survey* |
| Twizel | State Highway 8 Lake Tekapo to Twizel | Planned | Mid 2026 | 81% (April/May 2025) |
*Baseline speed survey column shows the % of vehicles travelling to the speed limit and the dates speeds were measured.
| Area | Location | Status | Expected enforcement date | Baseline speed survey* |
| Dunedin | State Highway 1 Allanton to Waihola | Planned | Mid 2026 | 79% (April/May 2025) |
*Baseline speed survey column shows the % of vehicles travelling to the speed limit and the dates speeds were measured.
| Suburb | Location | Status | Expected enforcement date | Baseline speed survey* |
| Kingston | State Highway 6 Kingston to Five Rivers intersection | Planned | Mid 2026 | 74% (April/May 2025) |
*Baseline speed survey column shows the % of vehicles travelling to the speed limit and the dates speeds were measured.